Concept Selection Study for Burhan North Water Injection Project

The scope of work for this Concept Selection Study covers the multidisciplinary assessment
and development of conceptual options for the planned production network expansion and
water injection development for Burhaan North Field (ARA PetroleumE&P).
The scope of this project is to perform a Concept Selection Study for:
• Hooking up of 20 new production wells to the existing production network,
• Developing the conceptual options for the water injection pipeline and flowline network for the 100 planned WI wells, and
• Defining conceptual options for the PWTP and Water Injection Pumping facilities.
• Carry out Hydraulic simulation for the network.
• Prepare comprehensive Concept Selection Report.
As global energy demand continues to grow, oilfield operations are evolving to meet higher standards of efficiency, safety, and sustainability. Strategic planning and engineering excellence are essential.

Leave a Reply

Your email address will not be published. Required fields are marked *