{"id":1008,"date":"2025-11-12T05:19:16","date_gmt":"2025-11-12T05:19:16","guid":{"rendered":"https:\/\/oilrigpro.zozothemes.com\/?p=1008"},"modified":"2026-05-30T21:19:01","modified_gmt":"2026-05-30T21:19:01","slug":"oil-and-gas-operations-overview","status":"publish","type":"post","link":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/2025\/11\/12\/oil-and-gas-operations-overview\/","title":{"rendered":"Salt Water Disposal Plant upgrade project for SARIR Oil Operations"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"1008\" class=\"elementor elementor-1008\">\n\t\t\t\t<div class=\"elementor-element elementor-element-28fff3f e-flex e-con-boxed e-con e-parent\" data-id=\"28fff3f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-852268e e-con-full e-flex e-con e-child\" data-id=\"852268e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3651373 elementor-widget elementor-widget-text-editor\" data-id=\"3651373\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"ewa-rteLine\">The project involves providing detailed engineering support for the upgrade of the Salt Water Disposal Plant (SWDP) at Sarir Oil Field, Libya.<\/div><div class=\"ewa-rteLine\">The existing facility handles approximately 66,000 BWPD of produced water, and the upgrade aims to increase the capacity to 80,000 BWPD in Phase-1.<\/div><div class=\"ewa-rteLine\">The scope includes integration of new equipment such as two hydrocyclones and one buffer vessel into the existing plant.<\/div><div class=\"ewa-rteLine\">\u00a0<\/div><div class=\"ewa-rteLine\">Elixir is responsible for delivering complete multi-disciplinary detailed engineering covering process, piping, civil, electrical, and instrumentation systems.<\/div><div class=\"ewa-rteLine\">The work includes development and validation of PFDs, P&amp;IDs, and process simulations, along with preparation of layouts, isometrics, and design calculations. A key aspect of the project is brownfield integration, including identification of tie-in points and modification of existing systems. The project also includes support for procurement activities such as technical bid evaluation and vendor document review.<\/div><div class=\"ewa-rteLine\">\u00a0<\/div><div class=\"ewa-rteLine\">The overall objective is to enhance plant capacity, improve separation efficiency, and ensure reliable and safe disposal of produced water.<\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>The project involves providing detailed engineering support for the upgrade of the Salt Water Disposal Plant (SWDP) at Sarir Oil Field, Libya.The existing facility handles approximately..<\/p>\n","protected":false},"author":1,"featured_media":8590,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[24],"class_list":["post-1008","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-refining","tag-hse"],"_links":{"self":[{"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/posts\/1008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/comments?post=1008"}],"version-history":[{"count":11,"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/posts\/1008\/revisions"}],"predecessor-version":[{"id":15804,"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/posts\/1008\/revisions\/15804"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/media\/8590"}],"wp:attachment":[{"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/media?parent=1008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/categories?post=1008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tkeworld.com\/demo\/exlier\/index.php\/wp-json\/wp\/v2\/tags?post=1008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}